LABORATORY IMPROVEMENTS
DEPARTMENT OF PUBLIC HEALTH, BUTTE COUNTY
695 OLEANDER
CHICO CALIFORNIA
project number 1668.1
ARCHITECT / CONSTRUCTION COORDINATION
Billson Construction, Inc.
VWR Laboratory Furniture & Fixtures
COLORS 09.10.2012
COLORBOARD PDF 09.10.2012
3D RENDERINGS 08.13.2012
CONSTRUCTION DOCUMENTS delta one issued 04.17.2012
1668.1 SPECIFICATIONS D1 04.17.2012.pdf (DIVISION 1-16)
1668.1 CONSTRUCTION DRAWINGS D1 04.17.2012.pdf
CONSTRUCTION DOCUMENTS delta two issued 11.26.2012
E.2 POWER & SIGNAL PLAN-D2.pdf
VWR SUBMITTALS/BACKGROUNDS
1668.1 SUBMITTAL ONE-SHOP DRAWINGS 10.05.2012
1668.1 CASEWORK BACKGROUND.dwg 10.10.2012
BILLSON SUBMITTALS
1668.1 SUBMITTAL 07-DOOR HARDWARE 08.07.2012
1668.1 SUBMITTAL 12-CASEWORK 08.07.2012
1668.1 SUBMITTAL 09-DRYWALL 08.07.2012
1668.1 SUBMITTAL 06-PLUMBING 08.08.2012
1668.1 SUBMITTAL 03-GLASS 08.08.2012
1668.1 SUBMITTAL 04a-ELECTRICAL 08.09.2012
1668.1 SUBMITTAL 04b-ELECTRICAL 08.09.2012
1668.1 SUBMITTAL 04c-ELECTRICAL 08.09.2012
1668.1 SUBMITTAL 04d-ELECTRICAL 08.09.2012
1668.1 SUBMITTAL 11a-HVAC 08.13.2012
1668.1 SUBMITTAL 11b-HVAC 08.13.2012
1668.1 SUBMITTAL 02-FLUID APPLIED FLOORING 08.13.2012
1668.1 SUBMITTAL 06.1-PLUMBING 09.04.2012
1668.1 SUBMITTAL 11b.1-HVAC 09.04.2012
1668.1 SUBMITTAL 13.1-VINYL FLOORING 09.012.2012
1668.1 SUBMITTAL 3.1-STOREFRONT 09.12.2012
1668.1 SUBMITTAL 4H-16000B Pane 10.02.2012
1668.1 SUBMITTAL 7.1 DOOR 10.02.2012
16681. SUBMITTAL 2.1 FLUID APPLIED FLOORING 10.02.2012
1668.1 SUBMITTAL 6.2 PLUMBING 10.02.2012
1668.1 SUBMITTAL 4e LIGHTING 10.09.2012
1668.1 SUBMITTAL 06.3 DI WATER 10.17.2012
1668.1 SUBMITTAL 17 WALK-IN COOLER 11.05.2012
1668.1 SUBMITTAL 9.1 DRYWALL 11.07.2012
1668.1 SUBMITTAL 15.1 PAINT 11.07.2012
1668.1 SUBMITTAL 15.2 PAINT SYSTEMS 11.07.2012
REQUEST FOR PROPOSALS