LABORATORY IMPROVEMENTS
DEPARTMENT OF PUBLIC HEALTH, BUTTE COUNTY

695 OLEANDER
CHICO CALIFORNIA
project number 1668.1

ARCHITECT / CONSTRUCTION COORDINATION

Billson Construction, Inc.

VWR Laboratory Furniture & Fixtures

COLORS 09.10.2012

COLORBOARD PDF 09.10.2012

 

3D RENDERINGS 08.13.2012

3D PDF 08.13.2012

 

CONSTRUCTION DOCUMENTS delta one issued 04.17.2012

1668.1 SPECIFICATIONS D1 04.17.2012.pdf (DIVISION 1-16)

1668.1 CONSTRUCTION DRAWINGS D1 04.17.2012.pdf

 

CONSTRUCTION DOCUMENTS delta two issued 11.26.2012

A.0 COVER D2.pdf

E.1 ELECTRICAL-D2.pdf

E.2 POWER & SIGNAL PLAN-D2.pdf

 

VWR SUBMITTALS/BACKGROUNDS

1668.1 SUBMITTAL ONE-SHOP DRAWINGS 10.05.2012

1668.1 CASEWORK BACKGROUND.dwg 10.10.2012

 

BILLSON SUBMITTALS

1668.1 SUBMITTAL 07-DOOR HARDWARE 08.07.2012

1668.1 SUBMITTAL 12-CASEWORK 08.07.2012

1668.1 SUBMITTAL 09-DRYWALL 08.07.2012

1668.1 SUBMITTAL 06-PLUMBING 08.08.2012

1668.1 SUBMITTAL 03-GLASS 08.08.2012

1668.1 SUBMITTAL 04a-ELECTRICAL  08.09.2012

1668.1 SUBMITTAL 04b-ELECTRICAL 08.09.2012

1668.1 SUBMITTAL 04c-ELECTRICAL 08.09.2012

1668.1 SUBMITTAL 04d-ELECTRICAL 08.09.2012

1668.1 SUBMITTAL 11a-HVAC  08.13.2012

1668.1 SUBMITTAL 11b-HVAC  08.13.2012

1668.1 SUBMITTAL 02-FLUID APPLIED FLOORING  08.13.2012

1668.1 SUBMITTAL 06.1-PLUMBING  09.04.2012

1668.1 SUBMITTAL 11b.1-HVAC  09.04.2012

1668.1 SUBMITTAL 13.1-VINYL FLOORING  09.012.2012

1668.1 SUBMITTAL 3.1-STOREFRONT  09.12.2012

1668.1 SUBMITTAL 4H-16000B Pane 10.02.2012

1668.1 SUBMITTAL 7.1 DOOR  10.02.2012

16681. SUBMITTAL 2.1 FLUID APPLIED FLOORING 10.02.2012

1668.1 SUBMITTAL 6.2 PLUMBING  10.02.2012

1668.1 SUBMITTAL 4e LIGHTING  10.09.2012

 1668.1 SUBMITTAL 06.3 DI WATER  10.17.2012

 1668.1 SUBMITTAL 17 WALK-IN COOLER  11.05.2012

1668.1 SUBMITTAL 9.1 DRYWALL  11.07.2012

1668.1 SUBMITTAL 15.1 PAINT  11.07.2012

  1668.1 SUBMITTAL 15.2 PAINT SYSTEMS  11.07.2012

 

 

REQUEST FOR PROPOSALS

1668.1 RFP 01 09.10.2012

1668.1 RFP 02 09.10.2012

1668.1 RFP 03 09.10.2012